What is typically found on a punch list?

Prepare for the General B Contractor Trade Exam. Study with engaging quizzes and insightful explanations. Ace your test!

A punch list is commonly created towards the end of a construction project and serves as a detailed outline of tasks that must be completed or corrected before the project can be considered fully finished. It highlights items that are deficient, incomplete, or require repairs. This list ensures that the contractor and client agree on what remaining work needs to be addressed, allowing for a smoother final inspection and project handover.

In contrast, a list of tools required for the project doesn't relate to completion tasks but rather to resources needed throughout the project. A breakdown of labor costs tracks expenses incurred, which are separate from completion tasks. A summary of inspections passed indicates compliance but does not reflect outstanding tasks that remain to finalize the project. Therefore, the answer focusing on the list of tasks to be completed aligns perfectly with the purpose of a punch list in construction practices.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy